The work we do on Queens buildings
Which job fits which building
Queens buildings repeat, so the jobs do too.
| Property type |
Typical job |
Common material |
Typical length |
| Row house or attached home |
Replacement, tear-off |
TPOModified bitumen |
1 to 2 days |
| Two-family home |
Seam and flashing repair |
Modified bitumen |
1 day |
| Multi-family or apartment building |
Replacement or coating |
TPORoof coating |
2 to 4 days |
| Mixed-use with storefront |
Leak, drain or flashing repair |
EPDMTPO |
1 to 2 days |
| Garage roof |
Coating or inspection |
EPDMRoof coating |
Half a day |
Swipe to see every column
Price comes down to size and deck condition. See what a replacement like these runs.